Wednesday 10 July 2013

Put the final window in the bathroom today, forgot to take a photo though. The truck's still at the garage so more stone work today, this time I'm rebuilding the garden wall that separates the higher and lower levels, it had partially collapsed. I had to dig all the stone out and then rebuild it. I'll have to build some steps up the side of the wall too. Filled in the drain trench too which runs parallel to the wall.





No comments:

Post a Comment