Thursday, 28 March 2013

I applied a second coat of plaster on the bathroom wall earlier this week, just needs a final coat. Today I finished the stud walling for the bathroom and set the drain in place for the shower. The shower is now ready to assemble and plumb in. I won't be able to do this for at least 10 days though, as I'm off to the UK for a film shoot in London and then I have a wedding next Saturday, so I'll crack on with the shower and bathroom the week after next when I get back.





The view from the garden during a well earned tea break.



The pipe for the shower drain





No comments:

Post a Comment