Thursday, 20 June 2013

This week, I 'ave mostly been diggin'. Dug the cobbles in the living room up, they were no good, very uneven and not at all level. Dug them all out and lowered the whole floor by about a foot, that's a foot length ways not sideways!! Took the kitchen steps out too, I was going to keep then but decided they looked a bugger and they were in the wrong place, too low. I'll have to make some new wooden ones I think. I also took the bottom of the stairs out to dig out the floor, but I've since replaced them.

I took lots of advice on how best to do the floor, and thanks to everyone who offered it. I've opted to beam and board it. Hence all the digging out. Ready for the next stage now, the beams, the floor boards will have to wait until funds become available.

Plastered the bottom of the stair wall today too. Need to get the final downstairs window in, but waiting for the window fairy to come, (you know who you are!)




These used to be my good wedding shoes in a previous life.






Mum visits to see how things are progressing.



The top of the breeze block is where the floor was.












Friday, 7 June 2013

Finished the final cement screed on the kitchen floor today and am now celebrating with some barbequed sardines and some red wine with my folks.









Wednesday, 5 June 2013

Back at it finally! More work turned up while I was in England so I had to extend my stay. Got back last Thursday. I got a sink waste while in the UK and had it stripped of chrome so it is now back to brass, to match the taps. Found an old second hand cabinet that will do nicely as a wash stand to house the copper sink, plumbed it in temporarily for now.



My Father and I started cementing the kitchen floor on Tuesday. I spent monday getting the levels and placing the rails that will be used to screed it off once the cement is down. Built a portion of the wall up at the end where the door will go too, next to the fig tree.















Friday, 10 May 2013

I can at last get rid of the old chair and shovel. Connected to the fosse septique today!! The toilet is now fully functional.



Thursday, 9 May 2013

I got back from work in the UK mid April, since then I've been busy working on my sisters place, insulating the roof and plaster boarding all over again, took the best part of a week.

The last 2 weeks I've been back at it on my own house, the shower is fitted and all the drains in place in the bathroom. Dug the trench for the drain to the fosse septic tank, very fortunate to have a wonderful neighbour who is allowing me to connect to his fosse for a period.

Bought an old French bed at a vide grenier (car boot sale) that I have now converted to a banister at the top of the stairs, lovely walnut wood. Also bought a hot water ballon off le bon coin for a bargain price, so not only will I be able to have a shower, I'll be able to have a hot one! once my dad does the electrics for the ballon, oh and we fit it of course.

Will try and complete the drains tomorrow before I have to go back to UK for another weeks work on Saturday, already looking forward to getting back here and continuing the work.

 Above is my mum at 76, demolishing the fireplace in my sisters place.

 Me and the old folks at Debs, my sisters place.



 Doing it all again at Debs.

 The walnut bed, now my stair bannister





 My dad at 75, digging the trench for the drains.